Grassroots LNG Peak Shaving facility – Fabrication and Setup

Greenville Peak Shaving Facility

THE NEED

Client needed a grassroots LNG Peak Shaving facility along with tanks, spill containment, vaporization system, hazard detection and also fire protection.

THE NORTHSTAR SOLUTION

20-year LNG plan that provided modular incremental solutions.  MDQ in 1996: 12,000 DEK per day

This project was completed in three phases.

Phase 1

The first phase was to design and build the LNG peak shaving facility. This phase consisted of the design and build of two 55,000 gallon, shop fabricated tanks, spill containment, remote heated vaporizer system, control building with hazardous detection, fire protection, and SCADA.

  • LNG storage: 8,400 DEK
  • Vaporization: 500 DEK per hour

Phase 2

The second phase of the project consisted of designing and building two additional 55,000 gallon, shop fabricated tanks, additional spill containment and additional vaporization capacity.

  • LNG storage add on: 8,400 DEK
  • Vaporization add on: 500 DEK per hour

Phase 3

The third phase consisted of additional storage and vaporization capacity.

  • LNG storage add on: 8,400 DEK

During phased upgrades other additions include back up system SCADA, controls, control building expansion, security, fire protection.

Project Details

CLIENT

Greenville Public Utilities

CLIENT PIPELINE

N/A

PROJECT TYPE

Commercial Development

DATE

2013 – 

 